top of page
This site was designed with the
.com
website builder. Create your website today.
Start Now
Jake Sip
E-Portfolio
Home
About Me
Project Pictures
Project Documents
Project Completion Report
Newsletter
Contact
More
Use tab to navigate through the menu items.
Outcomes and Deliverables
Milling Machine Work
Milling a newly designed bolt stop into a Remignton 700
Finished Bolt Stop
This picture shows the new location that the bolts stops at with the new bolt stop.
Finished Bolt Stop
A side view of the finished stop.
CNC Engraver
A picture of the CNC engraver I helped set-up and calibrate.
10/22 Stock
The new 10/22 stock that I desinged and built all finished and ready for paint.
Finished 10/22 Forend
Finished 10/22
Finished Remington 700
Complete with new bolt stop and recountored exterior that I designed.
Finsihed Remington 700 Forend
Remachined Remington 700 Bolt
The new bolt handle and knob that I redesinged and machined.
Remachined Remington 700 Bolt
Finished bolt with slimmed down shroud and weight reducing cuts in the bolt body that i machined and desinged.
bottom of page